The stakeholder and community feedback received by Council has been considered and, where appropriate, incorporated into the draft detailed design plans. The final detailed design plans were considered by the Traffic Committee at its meeting on 18 August 2021 in item 5.2 Hampden Road and Herbert Street, Chatswood to St Leonards - Bicycle Route Detailed Design Plans and Construction. The agenda is provided on Council’s website here
It is targeted that Council will consider the Traffic Committee minutes and its recommendation at its meeting in October 2021.
Background
You can view a recorded webinar providing an overview of the Chatswood to St Leonards bicycle route to the right of this page.
Council wants to hear your thoughts about draft detailed design plans to provide a safer and connected bicycle route linking Chatswood Central Business District with St Leonards Central Business District. Have your say in the survey below or pin the map to provide comment on a specific location along the route before 20 June 2021.
SUBMISSIONS NOW WELCOME ON DRAFT DETAILED DESIGN PLANS
Extensive community consultation on a proposed Chatswood to St Leonards Bicycle Route (also referred to as Cycleway) via Hampden Road and Herbert Street linking Mowbray Road, Chatswood and Herbert Street, St Leonards was undertaken in June and July 2020.
This community feedback informed finalisation of concept design plans endorsed by Council in September 2020. The draft detailed design plans build on the approved concept and provide more information on the changes along the cycleway.
Community feedback on the draft detailed design will assist finalisation of the detailed design to support the community’s needs.
The Chatswood to St Leonards Cycleway forms an important part of Council’s bicycle network.
Chatswood to St Leonards Cycleway will connect residents and visitors to retail, service, cultural and recreational uses and transport modes in Chatswood Central Business District (CBD), Lane Cove, Artarmon Local Centre and St Leonards CBD.
The detailed design plan has been funded in the Department of Planning, Industry and Environment Active Transport Links Program (Active Transport Link 2).
PROPOSED CHANGES TO HAMPDEN ROAD AND HERBERT STREET LINKING MOWBRAY ROAD, CHATSWOOD AND HERBERT STREET, ST LEONARDS Willoughby Council is committed to providing safe and accessible bicycle routes for the community. Safe bicycle routes encourage more people to ride, reduce congestion and support healthier and more active lifestyles. The draft detailed design plans provide the following:
|
ARTARMON LOCAL CENTRE BICYCLE CONNECTIONS The Artarmon Local Centre Public Domain Masterplan incorporates a shared path along the eastern side of Hampden Road connecting Brand Street and south of Jersey Road. The shared path will connect with bicycle lanes in Francis Road and Burra Road. Bicycle movement will benefit from traffic calming in the centre to produce a safer and lower speed environment and a 40 km/h High Pedestrian Activity Area. |
The section of the route along Frank Channon Walk between Albert Avenue and Nelson Street is an established shared path and is not under consideration as part of this community consultation. A new shared path connection will be provided between Nelson Street and Mowbray Road through the Chatswood Dive Site when the Sydney Metro project is complete.
Proudly funded by the NSW Government in association with Willoughby City Council
A brochure is provided to provide an overview of the project and the detailed design plans.
You can review the detailed design plans in the Detailed design plans for Chatswood to St Leonards Cycleway (simplified) section on this page. These plans have been developed to provide the changes in a simple non-technical format.
For those that wish to review the detailed design plans with engineering information, these are provided in the Chatswood to St Leonards Cycleway (engineering) section on this page.
Supporting information is also provided should this be helpful.
What happens next?
All comments will be taken into consideration and will contribute to the final detailed design plan.
The final detailed design plans will be considered by the Traffic Committee and forwarded to Council for its final decision.
When are the works planned for?
The next phase of the project is construction of the physical infrastructure. These physical works will follow Council approval of the detailed design plans and funding allocation.
Contact details
If you have any questions about this project please contact Kamoru Adetunmbi, Transport Engineer on 02 9777 1000 or email email@Willoughby.nsw.ov.au.
Your Privacy
The personal information that you have provided on this platform is necessary to enable Council staff to process the information and contact you if required. The personal information will only be viewed by Council staff who have responsibility for processing this information, however may be viewed by others as required by Law.
Please note that the content of your comments may be made available or reproduced in Council reports.
For further information regarding your privacy please refer to Bang the Table Privacy Policy at https://www.haveyoursaywilloughby.com.au/privacy-policy or the Willoughby City Council’s Privacy Statement viewed here.
Survey
CLOSED: This survey has concluded.
June 2020 -Chatswood CBD to St Leonards CBD Bicycle Improvement Plan
Your responses will assist in understanding the community sentiment to the proposed improvement plan as well as providing an indication of your current and potential use of a bicycle as a mode of transport.
Your effort and time in completing the survey is appreciated.
Consultation has concludedCLOSED: This survey has concluded.
Webinar Registration 18 June 2020 - concept design
23 responses
Consultation has concluded