Further Amendment to Willoughby Development Control Plan (WDCP) - Water Management
Share on FacebookShare on TwitterShare on LinkedinEmail this link
Consultation has concluded
Council is seeking comment on a further amendment to the draft Part C5 of Willoughby Development Control (WDCP) - Water ManagementbeforeMonday 16 September 2019.
The purpose of the draft amendment is to allow a concession that does not require on-site detention or installation of a rainwater tank for minor developments.
‘Notwithstanding items 11, 12, 13 and 14 above, alterations and additions to minor developments that do not result in more than 5% over the existing impervious area, providing the additional impervious area does not exceed 25m2.’
Enquiries to Arthur Tsembis, Strategic Planner on 9777 1000.
Written submissions should be sent to email@willoughby.nsw.gov.au or posted to PO Box 57, Chatswood NSW 2057 by Monday 19 September 2019.
Council is seeking comment on a further amendment to the draft Part C5 of Willoughby Development Control (WDCP) - Water ManagementbeforeMonday 16 September 2019.
The purpose of the draft amendment is to allow a concession that does not require on-site detention or installation of a rainwater tank for minor developments.
‘Notwithstanding items 11, 12, 13 and 14 above, alterations and additions to minor developments that do not result in more than 5% over the existing impervious area, providing the additional impervious area does not exceed 25m2.’