What's happening

A new cycleway is being planned which will create a continuous active transport corridor connecting Chatswood, Artarmon and St Leonards. It will improve safety, accessibility and connectivity for people walking and riding, while delivering significant streetscape improvements that support local centres, businesses and the broader community. Beyond improving walking and cycling, the project will create greener, more attractive streets and increase tree canopy.

The proposed route runs along Hampden Road, Artarmon and Herbert Street, St Leonards.

The project, proudly funded through the Transport for NSW Get NSW Active program will include:

  • 2.4 kilometres of dedicated, two-way bicycle lane separated from traffic and footpaths
  • 14 new pedestrian and bicycle crossings with upgraded lighting
  • new traffic calming measures with a new roundabout and raised intersections with continuous footpaths
  • streetscape improvements at Artarmon and St Leonards local centres, with new pocket parks, wider footpaths and feature paving
  • a new park with new street furniture and shade structures
  • extensive landscaping with new street trees, native planting and rain gardens.

View the Concept Design and have your say below. The Document Library below also contains further information and the technical documents.

What's changing

Parking spaces

  • 145 spaces will be removed across the corridor and 53 new angled parking spaces added within the side streets, for a net loss of 92.
  • Nearby streets have enough spare capacity to absorb the change.
  • Parking time limits will also change on some streets to improve turnover, and 99 spaces across the study area will have updated parking restrictions.
  • Essential parking, such as accessible spaces and loading zones, will be kept or replaced nearby.
  • Parking in Artarmon Town Centre won't be affected.
Punch Street closure
  • Punch Street will close where it meets Herbert Street.
  • It will become a new park with seating, shade and a direct link to the Gore Hill Cycleway.
  • Cars that currently use Punch Street will detour to Cleg Street.
Greening
  • 140 new trees will be planted.
  • 426 existing trees will be protected and kept.
  • 3,600m² new native garden beds.
Traffic calming
  • A new roundabout at Ella Street will improve safety for pedestrians and cyclists crossing Herbert Street.
  • An upgraded roundabout and raised intersection at Brand Street and Parkes Road, designed to handle larger vehicles including buses.
  • 14 new pedestrian and bicycle crossings along the length of the corridor.
  • New continuous footpath treatments at intersections including Palmer Street, Cleland Road and Lanceley Avenue.
  • Changes at Cleg Street/Herbert Street, which will take on traffic redirected from the Punch Street closure.
  • Traffic modelling shows traffic conditions are expected to remain largely similar to today, with only minor changes in performance at some intersections.

Footpaths and streetscape

  • New paving in Artarmon and St Leonards town centres.
  • New seating and lighting.

Chatswood to Artarmon Active Way webinar - 17 September 2026

Take a peek at how the Active Way will look

Click through the tabs below. The first tab shows the route of the proposed Active Way. On the three following tabs, slide the arrow from right to left to see how the street currently looks, and then how it will be transformed.

Precinct map

Precinct map

Precinct map showing proposed Active Way linking Chatswood to St Leonards via Artarmon.

Brand Street intersection

Before After

Punch Street Park

Before After

Lanceley Avenue intersection

Before After

How to get involved

Community drop-in sessions

Come along to find out more or talk to us about the project at one of these drop-ins:

1. Tuesday, 15 September 8-10am: Outside 7 Herbert St St Leonards (opposite Royal North Shore Hospital)

2. Saturday, 19 September 11am - 1pm: Artarmon Village Green Hampden Rd (opposite shops)

3. Tuesday, 22 September 11am - 1pm: Punch St (corner of Herbert St)

4. Thursday, 24 September 12 - 2pm: Artarmon Village Green Hampden Rd (opposite shops)



  • Fill in the online form below

    Feedback form is open from 27 August to 8 October 2026.


  • Send us an email

    email@willoughby.nsw.gov.au

    Attn: Hugh Myers, Project Manager - Streetscapes

  • Post a letter

    Willoughby City Council

    PO Box 57,

    Chatswood NSW 2067

    Attn: Hugh Myers, Project Manager - Streetscapes


Project timeline

  • Timeline item 1 - complete

    2019 - 2023

    Concept design development and community consultation

  • Timeline item 2 - complete

    2024 - 2025

    Design refinement and funding secured

  • Timeline item 3 - active

    August to October 2026

    Community engagement period 27 August to 8 October 2026

  • Timeline item 4 - incomplete

    February 2027

    The engagement outcomes will be reported to Council's Traffic Forum, and the minutes of that meeting reported to Council. Everyone who provides comments will be notified of the Council meeting date.

  • Timeline item 5 - incomplete

    Mid 2027

    Detailed design finalised

  • Timeline item 6 - incomplete

    Late 2027

    Construction commences


For enquiries, contact

Contact Information
Name Ailin Sun - Project Delivery Community Liaison Officer
Phone +61 (2) 9777 1000
Email email@willoughby.nsw.gov.au