Northbridge Local Centre - Draft Planning Strategy | Have Your Say Willoughby

Skip To

  • Skip to Contents
  • Jump to Navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Close Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    Have Your Say Willoughby
    • Home
    • Willoughby City Council
    • Open Consultations
      • Help Us Shape Your Local Centre
    • 2018-Past consultations
      • 2017 - Past consultations
      • 2016 & previous years - Past consultations
    • Sign In
    • Register
    Have Your Say Willoughby
    • Home
    • Willoughby City Council
    • Open Consultations
      • Help Us Shape Your Local Centre
    • 2018-Past consultations
      • 2017 - Past consultations
      • 2016 & previous years - Past consultations
    • Sign In
    • Register

    You are here:

    • Home
    • Next Step in Planning Strategies for Willoughby Local Village Centres & Housing
    • Northbridge Local Centre - Draft Planning Strategy
    Go Back

    Documents

    • File Indicative Northbridge Master Plan (6.37 MB) (pdf)
    • File Northbridge Sketch Perspective (2.48 MB) (jpg)

    Draft Housing Strategy 2036 [2019]

    • File Draft Housing Strategy 2036 (2.7MB) (2.77 MB) (pdf)
    • File Draft Housing Strategy 2036 (8MB) (8.04 MB) (pdf)

    Draft Local Centres Strategy 2036 [2019]

    • File Draft Local Centres Strategy 2036 (3.67MB) (3.68 MB) (pdf)
    • File Draft Local Centres Strategy 2036 (15MB) (15 MB) (pdf)

    Oct 18 Urban Design Study Willoughby Local Centres Report (Architectus)

    • File (REDUCED_55MB) Oct18 Urban Design Study Local Centres Report WCC_Architectus (53.9 MB) (pdf) (53.9 MB) (pdf)
    • File (LARGE_115MB) Oct18 Urban Design Study Local Centres Report WCC_Architectus (111 MB) (pdf) (111 MB) (pdf)

    2018 Feasibility Testing of Development Scenarios - Tipping Point Analysis (HillPDA Consulting)

    • File Hill PDA Willoughby Local Centres Feasibility Sept 2018_Tipping Point Analysis (539 KB) (pdf) (539 KB) (pdf)

    Previous Concept Studies - early 2018 [Low Resolution]

    • File Northbridge Centre Concept StudyLR (11.9 MB) (pdf)

    Previous Concept Studies - early 2018 [High Resolution]

    • File Northbridge Centre Concept Study (30.7 MB) (pdf)
    • Terms and Conditions
    • Privacy Statement
    • Moderation Policy
    • Accessibility
    • Technical Support
    • Site Map
    • LOVE. ENHANCE. CREATE. OUR FUTURE WILLOUGHBY
    • Past consultations 2018
    • 2017 - Past consultations
    Powered by Engagement HQ Powered by Engagement HQ